Addressing drainage issues: Drainage system needs to be totally redesigned.
Beatification of Pond (Cheruvu): Pond in the village needs some work for the banks. And some landscaping needs to be done around it. Planting some trees and installing few iron park style benches around the pond will be an excellent idea.
Un-completed cement roads: All the remaining streets needs be completed with cement roads.
Road between EVPalem and Pasumarru: There is a proposal from long time to lay a road from pasumaaru directly to EVPalem. Which shortens the distance from Chilakaluripet.
Road to EVPalem from Dandamudi Bridge (connecting to Nandipadu Road): This is also one of the item in the long waiting wishlist. If this road is laid, it will be like linking both Chirala road and Nandipadu road. Upon completion of this road, there will be lot of traffic moving through the village and in future village will flourish commercially.
Planting Trees across the streets of the village.
Play Ground for School with fence.
Shelves / wardrobes for the new school building to store teaching material.